Decision pendingLondon, England
East Havering Data Centre Campus (draft Local Development Order LDO0001.26), North Ockendon
A draft Local Development Order for the campus went to public consultation from 6 March to 12 April 2026 and, on the evidence I could find, has not yet been adopted: Havering's own pages still say the Strategic Planning Committee will take a final decision on whether to adopt it, and a report of 21 August 2026 describes the final decision as pending. A pre-action letter threatening judicial review was sent on 23 March 2026, but I found no claim filed. The 'status' value is the closest in the vocabulary for a draft LDO awaiting adoption. [S1] [S2] [S3] [S5] [S9]
Key facts
- Status
- Decision pending (application submitted) [S1] [S2] [S3] [S5] [S9]
- Decided by
- London Borough of Havering, as local planning authority (Strategic Planning Committee decides whether to adopt the LDO) [S2] [S3]
- Applicant
- Digital Reef (promoter); the draft LDO is made by Havering Local Planning Authority itself [S1] [S4]
- Developer or backer
- Digital Reef describes itself as a British sustainable infrastructure developer founded 2020 (developer website)
- References
- LDO0001.26
- Location
- Green Belt land at North Ockendon, in the east of the London Borough of Havering on the boundary with Thurrock, east of the M25 and near the Warley substation. Includes a data centre campus, indoor horticultural facility, district heating network, 113 ha Ecology Park and visitor centre. [S1]
- Total power
- 600MW [S1] [S4] [S11]
- Buildings
- Multiple data centre buildings (number not found), plus indoor horticulture facility, district heating network, visitor centre; developer text speaks of 'up to' 400,000 sqm of data centre space [S1] [S4] [S11]
- Investment (claimed)
- GBP14.7bn design and construction (developer website); GBP5.3bn (council Cabinet endorsement, November 2022) [S1] [S4] [S11]
- On-site generation
- Developer says 'net zero operational design, with no on-site fossil fuel use'; heated horticulture and district heating planned [S4] [S11] [S12]
- Cooling and water
- Not found in sources opened. Residents claim water use could equal tens of thousands of homes (campaigner claim) [S4] [S11] [S12]
- Designations
- Metropolitan Green Belt; High-pressure gas transmission pipeline crossing the area (campaigners' safety claim) [S5] [S6] [S8] [S13] [S19]
- Previous use
- Farmland (agricultural) [S5] [S6] [S8] [S13] [S19]
- Environmental assessment
- Environmental documents were published for the LDO consultation (council consultation page); an independent environmental report by Ramboll was commissioned in 2024 (Leader's statement). Contents not read [S5] [S6] [S8] [S13] [S19]
Timeline
- 2022-11Havering Cabinet endorsed the proposal as a GBP5.3bn investment opportunity (month from council news headline) [S1]
- 29 July 2024Council meeting on the proposal; Leader's statement of 31 July 2024 said an LDO was under consideration and an independent environmental report was being commissioned [S8]
- 24 February 2026Council announced it would ask the Strategic Planning Committee to approve consultation on the draft LDO [S3]
- 3 March 2026Strategic Planning Committee approved the draft LDO for consultation [S1] [S2]
- 6 March 2026Formal consultation on the draft LDO opened (originally to 7 April 2026) [S3] [S6]
- 17 March 2026UK Parliament petition 762320 'Stop the East Havering Data Centre from going ahead' rejected because it asked for local-level action [S10]
- 23 March 2026Protect the Green Belt (North Ockendon Alliance) served a pre-action letter proposing judicial review of the consultation (insufficient time, Equality Act duties, information, gas pipeline safety) [S5]
- 12 April 2026Formal consultation closed (council pages say 12 April; a headline reports the period was extended from the original 7 April) [S2] [S6]
- 21 August 2026Press report that the draft LDO consultation is complete and the final council decision is pending [S9]
Politicians and organisations
- Andrew Rosindell MP: said 'Twenty eight day consultation is not acceptable' and that the scheme is in completely the wrong place
- Havering Green Party: 'grave concerns remain' (headline, 24 April 2026)
- Damian White (then Conservative council leader, 2022): called for a public inquiry into Green Belt loss
- Protect the Green Belt (North Ockendon Alliance)
- North Ockendon Residents Association (NORA)
- Havering Friends of the Earth (Ian Pirie)
- No To East Havering Data Centre (informal residents' group)
- CPRE (2022 opposition)
- Global Action Plan / Stop Dirty Data Centres (protest, 27-28 February 2026)
Claims
Claims by developers, campaigners or councils, recorded as claims and not checked as fact.
- Digital Reef (developer): GBP14.7bn total investment; 620 permanent jobs in Havering; 1,780 jobs supported across UK; about GBP13.5m a year business rates; 113ha Ecology Park; biodiversity net gain figures [S1] [S4]
- Digital Reef (developer): Net zero operational design with no on-site fossil fuel use [S4]
- London Borough of Havering regeneration web page (council): At least 9,000 jobs across the borough and about GBP13.5m a year council income; GBP5.3bn investment [S1]
- Foxglove (Donald Campbell, Director of Advocacy) commenting on figures reported by The Guardian; figures republished by Fuse Energy and others (campaigners): Operational emissions of more than 1 million tonnes CO2e a year and 2.65 billion kWh a year of electricity, as stated in the developer's own planning documents (as reported); a 'staggering' threat to UK decarbonisation [S9] [S14]
- Protect the Green Belt (North Ockendon Alliance) (campaigners): Scheme is 'Europe's largest data centre' and sits on top of a high-pressure gas transmission pipeline with potential for disaster [S5]
- Press reports (Techerati, DCD) (other): Digital Reef reportedly offered the council GBP9 million if permission were granted (2022-23 reporting) [S11] [S15]
Campaigns
- Allow a 12-week public consultation on the 600MW data centre LDO (889 signatures)
- Stop the East Havering Data Centre from going ahead (UK Parliament petition 762320)
- Protect the Green Belt (North Ockendon Alliance)
- No To East Havering Data Centre
- Stop Dirty Data Centres: North Ockendon protest
Sources
- [S1] East Havering Datacentre and Ecology Park. London Borough of Havering. Level 1 source.
- [S2] East Havering Datacentre and Ecology Park (LDO page). London Borough of Havering. Level 1 source.
- [S3] Havering Local Planning Authority to seek approval for consultation on proposed LDO for East Havering Data Centre. London Borough of Havering, 24 February 2026. Level 1 source.
- [S4] East Havering Data Centre - Find out more. Digital Reef (developer website). Level 3 source.
- [S5] Havering Council faces judicial review over 'Europe's largest data centre' plan. The Havering Daily, 24 March 2026. Level 4 source.
- [S6] East Havering Data Centre consultation page. London Borough of Havering. Level 1 source.
- [S7] Sadiq Khan's Data Centre Plan Sparks Havering Green Belt Row. East London Times, 27 July 2026. Level 4 source.
- [S8] Leader's statement following the proposed East Havering Datacentre neighbours meeting. London Borough of Havering, 31 July 2024. Level 1 source.
- [S9] Digital Reef's proposed London datacentre could emit 1M tonnes of CO2 annually. CryptoBriefing, 21 August 2026. Level 5 source.
- [S10] Stop the East Havering Data Centre from going ahead (UK Parliament petition 762320). UK Parliament petitions. Level 1 source.
- [S11] 600MW East London green belt data center faces opposition from environmentalists and councillors. DatacenterDynamics, 15 November 2022. Level 5 source.
- [S12] 'A GBPbillion proposal on protected greenbelt land In Havering demands a democratic vote' - say residents. The Havering Daily, 28 May 2026. Level 4 source.
- [S13] No to East Havering Data Centre. No To East Havering Data Centre (residents' group). Level 6 source.
- [S14] East Havering data centre: 1M tonnes CO2e threatens UK net zero. Fuse Energy, 23 August 2026. Level 5 source.
- [S15] Havering Council may avoid public consultation for 'Europe's largest' data centre. Techerati, 5 October 2023. Level 5 source.
- [S16] Allow a 12-week public consultation on the 600MW data centre LDO. Change.org. Level 6 source.
- [S17] Campaigners unite to stop dirty Data Centres. Global Action Plan. Level 6 source.
- [S18] Havering Council maintains benefits of controversial data centre, despite pushback. Yellow Advertiser, 8 August 2024. Level 4 source.
- [S19] East Havering Data Centre public consultation. Upminster & Cranham Residents' Association. Level 6 source.