Vantage Bridgend (CWL4), former Ford engine plant

Bridgend's Special Development Control Committee approved the hybrid application on 2 October 2025, subject to the conditions in the officer report and amendment sheet. Building 1 has full permission; the other nine buildings have outline permission, so each still needs reserved matters, and members asked for those to come back to committee. I did not find a decision notice or any later change. [S1] [S2] [S3] [S4]

Key facts

Status
Approved - but it's not over (approved) [S1] [S2] [S3] [S4]
Decided by
Bridgend County Borough Council (Development Control Committee) [S1] [S2] [S3]
Applicant
VDC CWL4 Limited [S1]
Developer or backer
Vantage Data Centers Limited
References
P/25/247/HYB; P/24/471/ESO
Location
Former Ford engine plant, Waterton Industrial Estate, Bridgend; about 55 ha of previously developed land. Waterton Alderwood SINC lies to the west and the River Ewenny to the north. [S1]
Site area
55 ha [S1] [S8]
Buildings
10 data centre buildings (CWL41 full; CWL42-410 outline) and three substations [S1] [S8]
Investment (claimed)
A wider South Wales AI Growth Zone figure of 10 billion pounds was reported (DCD); no scheme-specific figure in the officer report [S1] [S8]
Backup generators
392 backup diesel generators proposed (emergency and testing); testing limited by condition to weekdays 10:00-16:00 and a maximum of 5 hours a year per generator [S1] [S2]
Cooling and water
Chillers for continuous cooling. Dwr Cymru Welsh Water confirmed limited local capacity; hydraulic modelling and reinforcement works required before connection, secured by condition. [S1] [S2]
Designations
Waterton Alderwood SINC (adjacent); Kenfig SAC (HRA stage 1 screening: no likely significant effect); Brocastle Brook culvert to be reduced from 123m to about 26m [S1]
Previous use
Former Ford engine manufacturing plant (production ceased 2020) [S1]
Environmental assessment
EIA development; Environmental Statement submitted (Welsh EIA Regulations 2017) [S1]
Public objections
3 [S1] [S2]

Timeline

  1. 31 May 2024
    Vantage buys the former Ford engine plant (month May 2024; day not stated). [S9]
  2. 2 August 2024
    EIA scoping opinion requested. [S1]
  3. 5 November 2024
    Scoping opinion P/24/471/ESO issued; public exhibition at Bridgend Rugby Club in November 2024. [S1]
  4. 28 May 2025
    Hybrid application P/25/247/HYB received. [S1]
  5. 1 October 2025
    Full committee site visit. [S2]
  6. 2 October 2025
    Special Development Control Committee approves the application (minutes of the same meeting approved at the 13 November 2025 committee). [S2] [S3] [S4]
  7. 6 October 2025
    Herald.Wales and Nation.Cymru report the approval (press dates, not decision date). [S5] [S6]
  8. 13 November 2025
    Development Control Committee meets; its pack only carries the 2 October minutes for approval, no data centre item. [S4]
  9. 21 November 2025
    South Wales AI Growth Zone announced, naming Vantage's Bridgend site. [S8]

Statutory consultees

BodyPositionDateDetail
Natural Resources Walesno objectionSubject to conditions; air quality chapter reviewed [S1]
Dwr Cymru Welsh Waterno objectionLimited capacity; hydraulic modelling and reinforcement by condition [S1]
Coychurch Lower Community Councilno objectionExpressed concerns about power and water availability for residents [S1]
Bridgend Town Council, Highway Authority, Shared Regulatory Services, South Wales Fire, Cadw, Heneb, National Grid Electricity Generation, Network Railno objectionSubject to conditions where stated [S1]

Claims

Claims by developers, campaigners or councils, recorded as claims and not checked as fact.

  • Applicant figures as reported in the officer report (developer): About 950 operational jobs (600 FTE on site, 350 supply chain) and about 1,500 FTE construction jobs plus 865 supply chain [S1]
  • Vantage Data Centers (as summarised in the officer report) (developer): Net-zero operational carbon by 2030 and net-zero water usage effectiveness at some campuses [S1]
  • Cited in the lead record to Senedd material; not found in any source I read (other): Around 600MW capacity for the Bridgend campus
  • Government announcement as reported by DCD (zone-wide, not this site alone) (other): Over 1GW operational by the early 2030s across the South Wales AI Growth Zone [S8]

Sources

  1. [S1] Officers Report P/25/247/HYB. Bridgend County Borough Council, 2 October 2025. Level 1 source.
  2. [S2] Special Development Control Committee 2 October 2025: Amendment Sheet. Bridgend County Borough Council, 2 October 2025. Level 1 source.
  3. [S3] Minutes of previous meeting (2 October 2025). Bridgend County Borough Council, 2 October 2025. Level 1 source.
  4. [S4] Public reports pack, Development Control Committee, 13 November 2025. Bridgend County Borough Council, 13 November 2025. Level 1 source.
  5. [S5] First stage of plans approved for new data centre in Bridgend. Herald.Wales, 6 October 2025. Level 4 source.
  6. [S6] Plans approved for new data centre at former Ford engine plant. Nation.Cymru, 6 October 2025. Level 4 source.
  7. [S7] Vantage: Bridgend CWL4 Data Center. Baxtel. Level 7 source.
  8. [S8] UK announces fourth AI Growth Zone in South Wales. DatacenterDynamics, 21 November 2025. Level 5 source.
  9. [S9] Vantage buys former Ford engine plant in Wales for data center campus (search listing only). DatacenterDynamics. Level 5 source.