Decision pendingNorth East, England
West Sleekburn Data Centre (Wansbeck Regeneration Ltd)
Wansbeck Regeneration Ltd submitted an outline application (all matters reserved except access) for up to 356,500 sq m of data centre floorspace at West Sleekburn, with documents published on 18 June 2026. It was still under consideration by Northumberland County Council in mid-September 2026. [S1] [S3] [S4] [S8]
Key facts
- Status
- Decision pending (application submitted) [S1] [S3] [S4] [S8]
- Decided by
- Northumberland County Council [S3]
- Applicant
- Wansbeck Regeneration Ltd [S1] [S3]
- References
- TGQCQFQSMQD00; 70739/01/NW/EC
- Location
- About 28 ha of agricultural land north-west of High Brocklands, West Sleekburn, south of the River Wansbeck with the A189 to the east; part of land associated with the former GlaxoSmithKline site. About one to two miles from the QTS Cambois site. [S1] [S2] [S3]
- IT capacity
- 50MW [S1] [S2] [S3]
- Site area
- 28 ha [S1] [S2] [S3]
- Buildings
- Three data centre buildings, two substations [S1] [S2] [S3]
- Investment (claimed)
- GBP3.8bn to GBP3.89bn (claimed by developer) [S1] [S2] [S3]
- On-site generation
- Gas power plant described as up to 49.9MW ancillary generation in the application description; DCD and Silicon describe 90MW of natural gas fuel cells as a bridging solution to be removed once fully operational. [S1] [S2] [S3]
- Backup generators
- Emergency generators using hydrotreated vegetable oil (Non-Technical Summary). [S1] [S2] [S3]
- Cooling and water
- Developer says private water supply via borehole. Water tank and pump room included. Not independently checked. [S1] [S2] [S3]
- Previous use
- Agricultural land, formerly part of land linked to the GlaxoSmithKline pharmaceutical site (operational 1971 to 2004, as reported by DCD) [S1] [S2]
- Environmental assessment
- Environmental Impact Assessment carried out; Environmental Statement and Non-Technical Summary submitted with application. [S1] [S2]
Timeline
- 18 June 2026Application documents published (planning.org.uk path dated 20260618); Place North East reports 'Plans in'. Press 19 and 23 June 2026 (DCD, Silicon). [S1] [S2] [S3]
- 17 August 2026Gazette lists a separate Factory Road, Cambois data centre screening opinion among new applications (different applicant, TBC Partners). [S5]
- 9 September 2026MP Ian Lavery asks the Prime Minister to block further data centres in Blyth and Ashington, naming West Sleekburn. [S6]
- 17 September 2026Council leader Glen Sanderson says there is 'a limit' to data centres Northumberland can house; West Sleekburn under council consideration. [S8]
Politicians and organisations
- Ian Lavery MP (Blyth and Ashington): moratorium and Critical National Infrastructure Levy (2026-09-09)
- Glen Sanderson, council leader: 'a limit' to data centres (2026-09-17)
- Kim McGuinness, North East Mayor: 'people over infrastructure' (2026-09-24, general)
- Protect the Wild (cumulative impact letter, 2026-09-30)
- Informal residents' group (weekly leafleting at QTS site)
Claims
Claims by developers, campaigners or councils, recorded as claims and not checked as fact.
- Wansbeck Regeneration Ltd (developer): 785 direct full-time jobs and 1,095 indirect (Silicon); construction 665-780 direct jobs and operational 460-640 direct jobs (Gazette/Place NE, from application documents) [S3] [S4]
- Wansbeck Regeneration Ltd as quoted by Silicon and LBC (developer): Data centres benefit from clustering; private borehole water supply avoids local supply impact; noise below background levels [S4] [S7]
- Ian Lavery MP (other): Moratorium needed until regulation catches up; community cannot become 'plug-in centre' for the nation's digital needs [S6] [S7]
Campaigns
- Residents' weekly leafleting and call for a pause (unnamed group)
- Protect the Wild open letter / petition against rapid AI data centre expansion
Sources
- [S1] West Sleekburn Data Centre Volume 3: Non-Technical Summary (application 70739/01/NW/EC). Wansbeck Regeneration Ltd via planning.org.uk, 18 June 2026. Level 2 source.
- [S2] Plans filed for three-building data center campus in Northumberland, UK. DatacenterDynamics, 19 June 2026. Level 5 source.
- [S3] Plans in for West Sleekburn Data Centre. Place North East, 18 June 2026. Level 4 source.
- [S4] Plans filed for second major Northumberland data centre. Silicon UK, 23 June 2026. Level 5 source.
- [S5] Potential new data centre among 13 new planning applications in Northumberland. Northumberland Gazette, 17 August 2026. Level 4 source.
- [S6] MP urges Prime Minister to block further data centre developments in Blyth and Ashington. Northumberland Gazette, 9 September 2026. Level 4 source.
- [S7] 'Dumping ground for data centres': locals 'extremely worried'. LBC. Level 4 source.
- [S8] Warning there is a 'limit' to the number of data centres Northumberland can house. Northumberland Gazette, 17 September 2026. Level 4 source.
- [S9] Northumberland data centres: Wildlife group warns of combined impact on nature. Northumberland Gazette, 30 September 2026. Level 4 source.
- [S10] Campaigners call for a pause on Cambois data centre plans. Northumberland Gazette, 19 August 2026. Level 4 source.
- [S11] Application filed for data center campus near QTS' site (Factory Road, TBC Partners). BeBeez, 18 August 2026. Level 5 source.