Early stageScotland, Scotland
Wester Hermiston data centre campus (Riccarton / Currie, Edinburgh)
At pre-application stage with no planning application found. The council screened out an EIA (re-screening reportedly 6 May 2026), but on 17 August 2026 Scottish Ministers directed that an EIA is required, so any application will need an EIA Report. Apatura's own timeline (Q1-Q2 2026 submission) has slipped. [S1] [S2] [S4] [S6]
Key facts
- Status
- Early stage (screening or scoping) [S1] [S2] [S4] [S6]
- Decided by
- City of Edinburgh Council (no planning application found); Scottish Ministers have directed that an EIA is required [S1] [S2] [S4]
- Applicant
- Apatura DC Project 11 Ltd (per Edinburgh News) [S2] [S5]
- Developer or backer
- Apatura
- References
- 25/03978/PAN; 25/02924/SCR; 25/05576/SCR
- Location
- Green Belt farmland north of Heriot-Watt University's Riccarton campus, west of Hermiston and the City Bypass, Edinburgh; connection planned to Currie substation [S3] [S5] [S9]
- IT capacity
- 200MW [S2] [S5] [S9]
- Site area
- 24 ha [S2] [S5] [S9]
- Buildings
- Three data halls (48MW, 48MW and 36MW, totalling 132MW) per the energy statement [S2] [S5] [S9]
- On-site generation
- Rooftop solar PV; potential waste heat export to a future district heating network (energy statement) [S5] [S6] [S9]
- Backup generators
- Campaigners claim up to 60 diesel generators (39,540 litres an hour if all run). Developer documents reviewed did not state a number. [S5] [S6] [S9]
- Cooling and water
- Free-cooling air-cooled chillers for data halls (energy statement). Campaigners raise unresolved water demand. [S5] [S6] [S9]
- Designations
- Green Belt; Prime agricultural land (campaigners say Class 2); Adjacent Union Canal corridor (campaigners) [S1] [S2] [S3] [S6] [S7]
- Previous use
- Agricultural farmland [S1] [S2] [S3] [S6] [S7]
- Environmental assessment
- Council screening: no EIA required. Scottish Ministers direction of 17 August 2026: EIA required. Edinburgh News reports Apatura had indicated it would carry out an EIA voluntarily. [S1] [S2] [S3] [S6] [S7]
Timeline
- 1 August 2025Proposal of application notice 25/03978/PAN reported as agreed (APRS; stale page) [S3]
- 28 November 2025Apatura energy statement for 'P108 Currie' dated (design-stage document, not an application) [S9]
- 19 December 2025EIA re-screening request reported validated by the council (APRS; last checked 23 February 2026) [S3]
- 17 March 2026Change.org petition launched [S7]
- 6 May 2026Council re-screening reportedly issued, EIA waived (campaign fact sheet only) [S6]
- 17 August 2026Scottish Ministers direct that an EIA is required, overriding the council's screening [S1] [S2]
- 16 September 2026Scottish Parliament votes that no hyperscale planning decisions be made until national guidance is complete [S14]
- 17 September 2026Ministers' EIA direction for all data centres over 50MW comes into force [S13]
Politicians and organisations
- Edinburgh South West petition targets Dr Scott Arthur MP and Simita Kumar MSP (a reply from Ms Kumar is posted as a petition update; content not read)
- West Edinburgh Against AI Data Centres
- APRS
- The Cockburn Association (commentary on Edinburgh's western edge)
Claims
Claims by developers, campaigners or councils, recorded as claims and not checked as fact.
- Apatura (reported by Resultsense, 21 September 2026) (developer): 332 on-site jobs and GBP1.2m a year community benefit [S11]
- Apatura consultation website (possibly out of date) (developer): Grid connection to Currie substation secured Q2 2025; operational 2030 [S5]
- West Edinburgh Against AI Data Centres (campaign fact sheet) (campaigners): Year-1 emissions of 139,147 tCO2e; up to 60 diesel generators; about 213MW continuous demand; 30.5 ha of Class 2 farmland lost [S6]
- Foxglove (campaigners): Over 200,000 tonnes of greenhouse gas a year at each of the two Edinburgh sites [S10]
Campaigns
Sources
- [S1] Data centre planning direction. Scottish Government, 17 August 2026. Level 1 source.
- [S2] Scottish Government intervenes over two proposed data centres in Edinburgh. Edinburgh News, 17 August 2026. Level 4 source.
- [S3] Apatura Wester Hermiston (Edinburgh) site page (last checked by APRS 23 February 2026). APRS. Level 6 source.
- [S4] Data Centre Map (status table, last updated 13 August 2026). APRS, 13 August 2026. Level 6 source.
- [S5] Wester Hermiston AI Data Campus - the project. Apatura (consultation website). Level 3 source.
- [S6] Campaign fact sheet, updated 2 July 2026. Change.org (Gordon Fraser), 2 July 2026. Level 6 source.
- [S7] Petition: STOP Hyperscale AI DATA CENTRE at Hermiston, Edinburgh. Change.org (Gordon Fraser), 17 March 2026. Level 6 source.
- [S8] Petition: Edinburgh South West open letter against AI data centre. Change.org (Gordon Fraser), 25 August 2026. Level 6 source.
- [S9] Apatura Energy - P108 Currie, Wester Hermiston Energy Statement (28 November 2025). Apatura Energy (hosted by APRS), 28 November 2025. Level 3 source.
- [S10] Edinburgh Council - require Environmental Impact Assessments for massive new data centres. Foxglove, 9 December 2025. Level 6 source.
- [S11] Apatura claims almost 2,100 jobs at Scottish data centres. Resultsense, 21 September 2026. Level 5 source.
- [S12] Petition update: URGENT CALL for the First Minister's Intervention. Change.org (Gordon Fraser), 28 April 2026. Level 6 source.
- [S13] Data centres: Chief Planner Letter and EIA Direction. Scottish Government, 16 September 2026. Level 1 source.
- [S14] MSPs reject datacentre moratorium but pause planning decisions. Computer Weekly, 17 September 2026. Level 5 source.
- [S15] Data Centres, Green Claims and Edinburgh's Western Edge. The Cockburn Association, 1 June 2026. Level 6 source.